For Parco di Pesaro, working alongside Studio EnerGi, we designed the electrical switchboards required to convert an existing villa into office premises within a public park. The project required the functional needs of the new workplace environments to be reconciled with the characteristics of the building, the constraints of its setting and the need to ensure the safety, reliability and operational continuity of the electrical systems. We supported the assessment of electrical requirements, the definition of connected loads and the organisation of the
distribution systems and the coordination of the technical information required for design development. In collaboration with Studio EnerGi, we developed the electrical switchboards and their configuration criteria, taking into account expected loads, protection systems, maintainability and the future management of the spaces. The work was carried out through an integrated approach, connecting building systems design with the property’s actual operating requirements. The result was an electrical system aligned with the building’s new office use and designed to ensure functionality, control and structured management over time.
Client: ENERGI / Villa e Parco di Pesaro
Location: Pesaro / Italy
Timeline: 2023
